Projects

  • 6.0M Homestead Preserve Parcel 6 & Parcel 7 Development Roadway Grading, Drainage, Sitework, and Utilities – Blythe Development/Warm Springs Investment Co., LLC. – Architect: Cole, Jenest & Stone, P.A. – Completion Date: June 2008
  • 1.9M VDOT Route 33 Town of Elkton Drainage Improvements & Utilities – Harrisonburg Residency – Architect: VDOT – Completion Date: July 2006
  • 0.5M Bath County Community Hospital – Demolition of Hospital Clinic Building – Completion Date: April 2006 – Contact Bath County Hospital Administrator – 540-839-7000
  • 0.6M VMI Patchin Field Stadium Foundations – Branch & Associates/VMI – Architect: SFCS, Inc. – Completion Date: April 2007
  • 2.1M MeadWestvaco Corporation – Covington, VA Plant, Filtered Water Plant; Excavation & Retaining Wall – Architect: BE & K Completion Date: November 2008
  • 0.6M NRCS, Verona Office – Waynesboro, VA, South River 26, Inch Branch Dam Rehabilitation & Utilities – Architect: NRCS Completion Date: July 2008
  • 2.1M Branch & Associates, Inc. – Lexington, VA, Rockbridge County Courthouse; Excavation & Concrete Walls – Architect: BCWH, Inc. – Completion Date: September 2008
  • 1.1M Blacksburg – VPI Sanitation Authority – Architect: Olver, Inc. – Completion Date: November 2005
  • 0.5M MeadWestvaco Corporation – Bleach Room Wall Demolition Phase I – Completion Date: December 2007 – Gordon Specht 540-969-5108
  • 0.8M VDOT Route 774 – Augusta County, VA; Bridge Demolition, Reconstruction & Approaches Over Middle River – Architect: VDOT – Completion Date: December 2009 – George Bezold, Lexington Residency 540-463-3108
  • 0.7M City of Harrisonburg – Elizabeth Street Bridge – Harrisonburg, VA; Bridge Replacement – Architect: Schwartz & Associates – Completion Date: November 2008
  • 0.9M George Phillips – Windy Cove Farm Bridge; Bridge Construction – Architect: Mattern & Craig – Completion Date: November 2009
  • 0.85M Wiley Drive Upper Low Water Bridge Replacement – Architect: N/A – Completion Date: April 2010
  • 1.1M MeadWestvaco Corporation – Bleach Room Wall Demolition PhaseA-B – Completion Date: July 2010 – Gordon Specht 540-969-5108
  • 3.2M Lower Jackson River Regional WWTP Force Main Installation; Including 600’ Aerial Crossing; Owner – Alleghany County; Engineer – AECOM; Construction Manager – Arcadis; March 2010-September 2011 – Contact – Jon Lanford 540-863-6600
  • 0.5M MeadWestvaco Corporation – Bleach Room Wall Demolition Phase D – Completion Date: September 2012 – Gordon Specht 540-969-5108
  • 3.1M Lower Jackson Regional WWTP Pump Stations – Construct 3 Pump Stations – Demolition of 1 Pump Station & Holding Tank and 1 Settling Basin; Owner – Alleghany County, VA; Engineer – AECOM; Construction Manager – Arcadis; Sept 2010 – Dec 2010 – Contact – Jon Lanford 540-863-6600
  • 3.1M MeadWestvaco No. 1 Power Boiler Sitework; Owner – MWV Packaging Resources Group; Engineer – KBR; September 2011 – August 2012 – Contact – William Doughty 919-744-9843
  • 2.5M MeadWestvaco Jackson River Bridge; Owner – MWV Packaging Resources Group; September 2011 – April 2013 – Contact – William Doughty 919-744-9843
  • 0.9M MeadWestvaco No. 1 Power Boiler Conversion Pond; Owner – MWV Packaging Resources Group; Engineer – KBR; October 2012 – September 2013 Contact – William Doughty 919-744-9843